case studies

Consider Maxim Crane your go-to source for heavy lift cranes. Over the past 20+ years, we’ve helped our customers achieve success with their projects with the right equipment at the right time. Maxim Crane has the experience, expertise, and equipment to handle a variety of projects in several industries. Below are some highlighted success stories.

In fall 2016, Maxim efficiently handled heavy rigging for the Moxie Freedom Energy project in Pennsylvania, safely setting turbines and generators on schedule.
Longview Power, a 769 MW coal-fired plant, achieved high efficiency and minimal emissions with help from Maxim, completing 175,000 work hours without major incidents.
In 2012, Enel Green Power completed the 200MW Caney River Wind Farm. The $350 million project used Maxim Crane’s services, with over 30,000 labor hours and no major incidents.
Intel Fab 42 in Chandler, Arizona, a $5 billion semiconductor factory, used over 30 cranes from Maxim Crane Works resulting in 90,000 work hours with no major safety incidents.
Maxim efficiently replaced a downed conveyor system in a Portland packaging plant ahead of schedule, showcasing their expertise in heavy haul operations.
Maxim Crane Works successfully lifted and transported a historic 500,000-pound steam engine, known as “The King,” using a tandem lift with specialized cranes.
Maxim Crane Works leverages tilt-up construction experience to build 760,000-square-foot building near Denver International Airport.
The 14.5-acre retractable roof at Mercedes-Benz Stadium was built with Maxim Crane’s assistance and completed 72,618 machine hours without incident.
Brickell City Center is a mixed-use development ranging from commercial to hotels. More than 11 cranes of various sizes and types were required for the project’s operation and maintenance.
Lucas Oil Stadium features a retractable roof unmatched by any other. Maxim Cranes provided cranes from 15-300 tons, allowing for over 18,000 hours of work to be completed without major incidents.