(877-629-5438)
Case Study: Download
Location: Nashville, TN
Type: Multi-stage music festival requiring new infrastructure to be set up and dismantled within a week period.
Project Duration:May 28 – June 1, 2025
Man Hours Worked: 30
Cranes On-site:
6 All Terrain Cranes
Total: 6
For over a decade, Maxim Crane has been the trusted partner behind the scenes at Nashville’s iconic CMA Fest. For the 2025 event, held from June 5-8, which draws an estimated 95,000 fans, Maxim was once again tasked with providing the critical lift solutions for the construction and dismantling of four main stages. Our team’s precision, expertise, and commitment to safety were instrumental in ensuring the festival’s infrastructure was ready for a flawless four-day event.
Executing a project of this scale in the heart of a bustling downtown area presents a unique set of challenges. The CMA Fest build required a partner who could navigate:
Leveraging a partnership that dates back to 2008 (under the Amquip name), Maxim Crane developed a comprehensive, site-specific lifting plan. Our strategy was built on selecting the perfect crane for each stage’s unique demands to maximize efficiency and safety.
Maxim Crane’s meticulous planning and flawless execution delivered exceptional results, ensuring the festival’s critical infrastructure was in place on schedule. The outcome was a resounding success:
Whether it’s a high-profile music festival or a complex industrial project, Maxim Crane has the fleet, expertise, and dedication to ensure your project is a success. We are more than a vendor; we are a partner in planning and execution.
Contact us today to get started on your next lift.